v0.4 Draft
Normative

Architecture, Engineering and Construction

For design charrettes, coordination meetings, and owner-architect-contractor sessions where several disciplines study questions against a shared model or drawing set.
published
Standard v0.4
Profile v0.4

Inherited from core

Question
A decision is unknown and blocks progress. May resolve with no agent work at all.

Plus the 21 shared cues in the core vocabulary, which every profile inherits.

Call types specific to this domain

Clash
Two systems want the same physical space.
Routing
Whether something fits, and what path it takes to get there.
Load
A capacity question — electrical, cooling, ventilation, structural, or water.
Code
An adopted code, jurisdiction, listing, or approval question.
Price
A cost or value-engineering comparison.
Build
A constructability, sequencing, or means-and-methods question.
RFI
A formal response is owed to another party.
Product
Manufacturer or equipment data evaluated against the actual design constraints.

Dialect

acknowledgeHeardListening

Standard in coordination rooms. Recorded from real owner-architect-contractor sessions, not chosen for style.

already_ownedAlready mineAlready running

Reflects that the agent study is already under way, which is the usual reason a task is re-raised.

Approval

The design professional in responsible charge who will seal the drawing or calculation the result affects.

The owner still closes the task and states the disposition. Approval is an additional gate on reliance, recorded before the result leaves the room as a finding.

Where a jurisdiction or licensing board designates responsible charge for the work, that person approves and this profile cannot designate anyone else. An agent result is a study input, never a sealed document.

Additional states

sign_off
MUST
after close

Where the closed result will be incorporated into a document bearing a professional seal, the professional in responsible charge records approval in the project record, separately from the verbal close in the session.

Who this is for

Design charrettes, coordination meetings, and owner-architect-contractor sessions where several disciplines study questions against a shared model or drawing set.

These meetings already run on an implicit protocol — an agenda, logs, a round table, polling by name. What they generally lack is a way to close anything in the room. A coordination question gets discussed thoroughly, lands on "it depends," and leaves as a request for information. Under this Standard it leaves as a claimed task with a named owner and a stated disposition.

Call types

SayWhen
ClashTwo systems want the same physical space.
RoutingWhether something fits, and what path it takes.
LoadA capacity question — electrical, cooling, ventilation, structural, water.
CodeAn adopted code, jurisdiction, listing, or approval question.
PriceA cost or value-engineering comparison.
BuildConstructability, sequencing, or means and methods.
RFIA formal response is owed to another party.
ProductManufacturer data evaluated against the actual design constraints.

Load is deliberately broad across disciplines rather than reserved for structural loading, because in a coordination meeting the word is used that way in practice.

Ownership

TaskOwner
Clash, RoutingThe discipline whose system has to move
LoadThe engineer responsible for that system
CodeAny design professional on the affected discipline
PriceEstimator or contractor
BuildContractor
RFIProject manager, with the responsible discipline reviewing
ProductThe specifying engineer — never a manufacturer's representative

Approval

This profile requires approval. The Owner closes their own task, as in every domain — but in this one, a closed result cannot be relied upon until the professional in responsible charge has approved it.

Approver: the design professional in responsible charge who will seal the drawing or calculation the result affects.

Where a jurisdiction or licensing board designates responsible charge for the work, that person approves and this profile cannot designate anyone else. That is licensure law, not a rule this Standard invented.

An agent result is a study input. It is never a sealed document, and it does not become one by being approved. Approval under this Standard establishes that a qualified person has reviewed the study and decided what may be relied on. Sealing remains governed entirely by the applicable licensure law.

Additional required state: Sign-off

This profile adds one REQUIRED state after CLOSE:

sign_off — Where the closed result will be incorporated into a document bearing a professional seal, the professional in responsible charge records approval in the project record, separately from the verbal close in the session.

The verbal close ends the loop in the room. The recorded sign-off is what survives into the project file.

Worked examples

Worked examples for this profile are published as data in examples/transcripts/, so the dialogue exists in exactly one place and the repository validator checks that every spoken cue still matches the vocabulary this profile declares.

  • Does the kitchen shaft still work? — a real coordination meeting. A prospective restaurant tenant wants a solid-fuel smoker; the task ends Parked with a named blocker rather than Accepted, which is the interesting part.
  • Nobody was listening when the constraint was given — the same kind of meeting run the way most rooms already run it. Three invariants break in under a minute, none of them noticeably, and a wrong answer reaches a tenant.

They render at co-prompting.com/examples.

Vocabulary

The shared vocabulary — Hold, Clarify, Mine, Prompting, Add, In, Preliminary, Out of scope, Parked, Pass, and the rest — lives in the core specification, Section 7. It is the same in every domain, and several of those cues are MUST-level because they carry an invariant rather than a convention.

Dialect

This profile substitutes two phrases, both recorded from real coordination meetings rather than chosen for style:

CueCore defaultThis profile says
acknowledge"Heard""Listening"
already_owned"Already mine""Already running"

Every other cue uses the core phrasing — including "Back with …", which the core already adopted from AEC practice.

Two worth emphasizing

Out of scope. In a live coordination meeting, a question that falls outside the contracted scope is easy to absorb without comment, and the cost surfaces weeks later. The Standard takes no position on how such work gets authorized. It requires only that the boundary be named while everyone is present.

Preliminary. This is MUST-level, not a courtesy. An unclosed exhaust calculation repeated to a tenant becomes a commitment the moment they act on it.

Notes on vocabulary

Clash is used in its ordinary coordination sense. It does not imply an automated clash-detection run has been performed.

Do not use Change as a call type. It collides with change orders and implies a commercial decision has already been made.

A participant continuing their own agent on an existing task is not making a Call.

Retention

Ten years is set as a floor, on the reasoning that the record should meet or exceed the statute of repose in the project jurisdiction. Confirm the applicable period locally — this is a floor, not legal advice.

The record should carry the project identifier, the discipline, the drawing or specification section affected, and the identity and licence designation of the approving professional.